PROJECT:Bristol Myers Squibb, Child Development Center - Sitework
CONTRACT AMOUNT:$900,000
OWNER:Bristol Myers Squibb
CONSTRUCTION MANAGER:Gazetten Contracting, Inc.

SCOPE OF WORK: Complete Site Improvements consisting of:
  • Site surveying / construction layout & as-builts
  • Miscellaneous site demolition (curb, pavement, pipe removals).
  • Soil erosion control measures.
  • Mass earthwork (30,000 CY), site grading, and topsoil placement.
  • Import & placement of structural fill for building pad construction.
  • Building foundation excavation & backfill.
  • Construction of 1700 LF of storm drainage (15" to 30" Dia. RCP) and storm water management basin and control structures.
  • Construction of 2900 LF of 6" PVC sanitary sewer system.
  • Construction of 1700 LF of 8" x 12" DIP fire-water system.
  • Construction of 1450 LF of 3" x 6" domestic-water system.
  • Excavation, backfill, concrete encasement, and pull-boxes for 270 LF of electrical conduit system.
  • Excavation, backfill and pull-boxes for 360 LF of communication system.
  • Excavation and backfill for 375 LF of steam and condensation system.
  • Construction of concrete curb, sidewalks and service entry pad.
  • Construction of DGA subbase and bituminous pavement for roads and parking areas.
  • Rock excavation for utility installation.